The right moment
Cleaning too early is a costly mistake. If defects are remedied, skirting boards refitted or fittings installed afterwards, dust and drilling dust appear again – and the same area has to be cleaned a second time. So we do not ask for your preferred date but for the day the last trade leaves the building. We schedule the job between that day and the handover. Give us that date when you send your request.
Release, power and water
We only enter sections that the site management has expressly released. Released means: the work there is finished, nobody is working above our heads any more, and the section is closed off against new material being brought in. Who gives this release and which floors it covers is recorded in writing before the first working day. We do not start without a named contact on site.
A building site has to meet certain conditions for cleaning work itself. We need lighting, a socket that can take an industrial vacuum cleaner, a water supply with somewhere to drain, as well as secured stairs, railings and closed shafts. Without power there is no vacuuming; without water, no wet cleaning. Both are settled beforehand, not on the day. Our staff bring their own safety boots, gloves and dust protection. Let us know who gives the release on your site.
Cleaning is not disposal
Cleaning is not disposal, and this line is drawn more sharply than many people expect. Offcuts, pallets, film remnants and leftover building materials are not dirt but surplus building material – they belong in the project's skip, and we do not take them away. Ask us if you are unsure what counts as dirt.
Film, adhesive and glass
It is rarely the surfaces that take up time, but adhesive residue. Protective film on window profiles, door frames and shower screens is meant to stay on for a few weeks. If it sits behind glass for a whole summer, the adhesive cures and can only be removed strip by strip with solvent and a plastic blade. The same applies to forgotten masking tape and labels on sanitary ware.
With glass, the type of glazing determines the method. Cement, plaster and mortar splashes can be soaked and taken off ordinary float glass with a blade. Coated panes – solar control glass and certain functional glazing – cannot take this: the coating sits on top and answers every stroke of the blade with marks that cannot be polished out. If we have no information about the glazing, we work without a blade and allow more time. Tell us in advance how long the film has been on and what glass is fitted.
Floors after the build
After building work, floors need more than one mopping pass. Screed and concrete dust binds with water and leaves a haze if the water is not changed often enough, so we change the water frequently rather than increase the dose. Cement haze on tiles needs an acidic product that attacks natural stone and fresh grout – so it is tested first in an inconspicuous spot. Newly laid parquet, oiled floorboards and fresh silicone joints stay dry until the waiting time specified by the manufacturer has passed. Give us the date each floor was laid.
What we need to know beforehand
Square metres alone are not enough for a reliable assessment. What helps: the state of construction and the date of the last trade, the floor area per storey, the number of windows, doors and sanitary fittings, the floor types and when they were laid, whether protective film is still on, whether power and water are connected and whether a lift is available. Send us these details with your request.